Home Up Contents Feedback/Orders Students/Careers Disclaimer Glossary A-E

Projects

Home Up

1,456MW coal-fired power plant plus jetty.  Fuel advisory, PPA, and modelling.
  • 2,063MW Net Capacity coal-fired power plant.  Financial modelling, fuel source analysis, plant operations review, and PPA negotiations.
  • 80MW open-cycle turbine located at a gasfield transmitting to a mine load. Condensate fuel backup.
  • 44 MW cogeneration using steam-injection on peak. Specified the engineering and insurance reviews for financing.
  • 12 MW open-cycle plant with 26km gas spurline. Full turnkey workup, site/easement acquisition, and O&M support
  • 4.6 MW reciprocating engine island power plant, including upgrade through transmission and distribution.
  • 345 MW combined-cycle gas turbine plant, with particular emphasis on tariff structure and financability.
  • Scoping and review of nine power and cogen options for 10 MW load.
  • Comparison of gas, distillate, and coal configurations.15 MW methane-drainage turbine plant (coal mine) including fuel gas treatment and compression.
  • 24 MW combined-cycle power plant using oil refinery high-hydrogen off-gases.
  • PPA with refinery and state utility.66 MW barge-mounted diesel sets requiring political-risk insurance. PPA partly indexed to customer's price index.21-year coal supply agreement negotiations.
  • Mediation on escalation methodologies and force majeure clauses.
  • 6 MW single turbine for high pressure steam, with utility standby.
  • 27 MW open-cycle utility power station, dual-fuelled, designed for fully automatic system operation.
  • 15 MW open-cycle turbine plant, including fuelgas treatment supporting industrial and utility loads at 22 KV and 66 KV.
  • 104 MW combined cycle turbine plant with chillers. Export credit and local currency financing.
  • 2x30 MW and 2x60 MW coal-fired power plants as refurbish-own-operate joint venture
  • 350 MW island plant servicing industrial development on a BOO facility
  • 2,100MW, the world's largest IPP, where the main issues are the PPA fit to the equipment, tariff, and financing  

    Home ] Up ]

    ©  IAF 2009     email: iaf(AT)iaf.biz