INFORMATION OBJECTIVES
The Developer first needs summary information to scope the technical analysis and commercial structure and alternatives suitable for a BOO project. Two studies are conducted in parallel : | Power Output Simulation | Financing Analysis / Sensitivities Once these have converged on a satisfactory option, then a memorandum of understanding would be agreed laying out the framework of the key terms, conditions, and specifications. This is then firmed up into : | Power Supply Offer | Technical Supply Specification | Turnkey Contract Outline Once these are agreed, the suite of documents are put into place in preparation for the Bankers Information Memorandum drafting. |